Large Forming Press Recovery & Load Out
Albacor Shipping - Houston, TX
Taylor's work included:
A. Engineer approved: lift plans, floor analysis and reinforcement, all challenging and crucial.
• During a prior move of the same press, the old concrete floor was damaged around the 30’ pit.
• No existing floor prints were available of the old plant.
B. Design, engineer & fabricate (4) lifting lugs to accommodate the (6) half-million lb press frames.
C. Recover fallen frame from pit.
D. Distribution of load(s) over 12” oak mats.
E. 21 continuous work days onsite to meet the ship schedule to China.
Proper planning proved to save time and streamline the goals of the project, making the big job a small matter.
“Taylor Crane did a great job and we were very pleased with their efficiency and saftey.”
Bill Frankinburger
|