Plant RELOCATION

TCR offers full service plant relocation. We have experience moving entire plants across town and across the country. Our equipment and personell can handle any size job. Whether we utilize our 600 ton jacking system or our 80,000 lb. fork trucks, our skilled professionals make any relocation more efficient and effective. 

We work closely with our in-house Engineering Department to develop strategic move projects and detailed lift plans to complete the safest, most efficient lifts possible.

 

Corporation
PLANT MOVE

Omaha, NE to Greenwood, SC

Move plant from Omaha, NE to Greenwood, SC.  In addition, Vickers requested machines be cleaned and painted at TCR, Coffeyville, KS prior to shipping to Greenwood, SC for offload and reinstall

  • Over 1,750 machines per move including, Broaches, Mills, Washers, Cooling systems, Vibes, Demags, Various Drills and Machining centers, Conveyors, etc.
  • Plant move took place over 1 year period with 36 trips to Omaha.
  • 200 trucks loads shipped consisting of oversize, legal flats, steps, vans

50 Truckloads
CROSSING BORDER

Johnson Controls – Monterey, Mexico to Norman, OK / Wichita, KS

Dismantle, load, transport, offload and reinstall entire plant from Mexico to Norman, OK and Wichita, KS. Machinery included: presses, shears, assembly lines, ovens, and more.  Project required extensive planning and communication with border authorities and was finished ahead of the one-month timeline. 

Relocate Large Sheet
Metal Paint System

Waterloo Industries – Muskogee, OK

Relocated (4) plants and printing equipment into one.

System designed and engineered by George Koch Sons, LLC – Processed over 2.5 million sq. Ft. of Sheet Metal Annually

Taylor’s work included: dismantling, packing, loading out, and transporting system to buyer: Johnny Davis – Progressive Finishes. 501 Industrial Drive, Alabaster, AL 35007 (205)685-8056

Electrocoat System (E-Coat):
(3) Koch Anodic E-coat lines, each 200 ft. long, 23,000 gallons, modified epoxy tanks with glass cloth reinforced lining, for both anodic and cathodic for 3 colors of paint

Pretreatment Washer:
Dual line, 203 ft. long, 8 stage, iron phosphate.


Dry Off Ovens:
(2) Large gas fired curing ovens, to 450 degrees (F).

Conveyor System:
A network of (9) individual conveyors, 5500 ft. of power and free, 400 carriers, (3) hang stations, and (6) take off zones.

Electrostatic Spray System:
(3) Fanuc P100 6 axis paint robots with RH controllers, (2) Ransburg AeroBell 33 electrostatic rotary systems.

Mezzanine System:
Atlas manufacturing beam and truss, 12,656 sq. Ft. with elevators and floor conveyor.

Machine Shop
RELOCATION

Carlson Company – Tulsa, OK

TCR provided manpower and equipment to relocate Machinery to Carlson’s new location at 4333 S. 86th Ave.

Plant
RELOCATION

Johnson Controls – Largo, FL

Taylor Crane & Rigging supplied supervision, manpower, and equipment to dismantle, load, transport, offload and reinstall the entire plant from the existing plant to the new plant. During the process of plant relocation, JCI Company stayed in full production and customer orders never went below ninety-seven percent.

The project was completed on time, with no incidents or injuries to the customer’s satisfaction.

Related
PROJECTS

9

Transformer Switch over Mezzanine

Taylor moved (2) transformers on Mezzanine above chrome plating dip tanks. The transformers had to be switched. The first one weighed 1000# and the second one weighed 1700#..

9

Ball Mill Tire Change Out

Southern Welding contracted TCR to change out two 15′-diameter, 31,000-lb. tires and the adjacent rings (also 15′ in diameter) at the Central Plains Cement plant in Tulsa, OK..

9

Feed Water Heater Changeout

Taylor Crane & Rigging was challenged with removing two 115,000-lb. vessels and reinstalling two new replacement vessels from the second story of a power generation station ..

9

Plant Equipment Installation- New Plant

Supplied Manpower & equipment for Turnkey Installation of:

  • Over 40 Niagara clearing metal stamping presses
  • 22 Orttech Hydraulic units
  • 12 Sesco stock feeding systems…
9

Rear Modular Assembly Installation

Taylor Crane was awarded the contract from Forie Automation for the rear modular assembly project at the Woodbridge assembly plant in KC, MO. This project consisted of installation of the following:..

9

Sutton Table Removal & Relocation

Lower, remove, and relocate sutton tables and straightener.  Taylor provided manpower, equipment and materials necessary to modify the in-board and out-board table tops and drive bases for the straightener. 