Newsletters

2022 Third Quarter Newsletter Issue #3

2022 Third Quarter Newsletter Issue #3

2022 Third QuarterNewsletter issue #3 TUBE BUNDLE INSTALL Taylor Crane & Rigging supplied manpower and equipment to install 200,000 lb. tube bundle with three Versa-Lifts, overhead crane and lifting bars. Project was completed on time with no injuries. Our client...

read more
2022 Second Quarter Newsletter Issue #2

2022 Second Quarter Newsletter Issue #2

2022 Second Quarter Newsletter Issue #2 PRESS INSTALLATION Taylor Crane & Rigging supplied supervision, manpower and equipment to unload 135k lb press, move it inside Pryer Aerospace,stand up & set press on new concrete pad.PRESS OFFLOADING Taylor Crane &...

read more
2022 First Quarter Newsletter Issue #1

2022 First Quarter Newsletter Issue #1

2022 First Quarter Newsletter Issue #1 TRANSFORMER MOVE TCR crews safely, and successfully transported a 270,000 lb transformer and set on the pad using our Jack and Slide System in Western Oklahoma.MACHINERY MOVING Our best in the business Machinery Movers lifting...

read more

Articles

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Social Media

9

Transformer Switch over Mezzanine

Taylor moved (2) transformers on Mezzanine above chrome plating dip tanks. The transformers had to be switched. The first one weighed 1000# and the second one weighed 1700#..

9

Ball Mill Tire Change Out

Southern Welding contracted TCR to change out two 15′-diameter, 31,000-lb. tires and the adjacent rings (also 15′ in diameter) at the Central Plains Cement plant in Tulsa, OK..

9

Feed Water Heater Changeout

Taylor Crane & Rigging was challenged with removing two 115,000-lb. vessels and reinstalling two new replacement vessels from the second story of a power generation station ..

9

Plant Equipment Installation- New Plant

Supplied Manpower & equipment for Turnkey Installation of:

  • Over 40 Niagara clearing metal stamping presses
  • 22 Orttech Hydraulic units
  • 12 Sesco stock feeding systems…
9

Rear Modular Assembly Installation

Taylor Crane was awarded the contract from Forie Automation for the rear modular assembly project at the Woodbridge assembly plant in KC, MO. This project consisted of installation of the following:..

9

Sutton Table Removal & Relocation

  1. Lower, remove, and relocate sutton tables and straightener.  Taylor provided manpower, equipment and materials necessary to modify the in-board and out-board table tops and drive bases for the straightener. 