PROJECT SUMMARY

Pryer Aerospace Press Installation

PROJECT SUMMARY

Moved Two HUGE Outdoor Gantry Cranes

PROJECT SUMMARY

Taylor Crane Raises the Roof!

PROJECT SUMMARY

Megatron Art Sculpture Move

PROJECT SUMMARY

Jack and Slide 2013

Equipment Features

Always growing our fleet for building tomorrow

EQUIPMENT FEATURES

Ormig Pick and Carry Crane

EQUIPMENT FEATURES

K25 PowerBooster

EQUIPMENT FEATURES

We own every size of versa-lift

EQUIPMENT FEATURES

Liebherr LTM 1220-5.2

EQUIPMENT FEATURES

Liebherr LTM 1130-5.1

EQUIPMENT FEATURES

TEREX RT775 ROUGH TERRAIN CRANE

EQUIPMENT FEATURES

Terex RT 230

EQUIPMENT FEATURES

Grove TM890

Helpful Tips

Hear it from the experts!

HELPFUL TIPS

How to use a ratchet strap correctly

About Us

Get to know our history!

ABOUT US

Jim Taylor’s 50th Anniversary Speech

ABOUT US

TCR Showcase

ABOUT US

Veteran’s Day 2016 – Flag Ceremony

ABOUT US

From All of us….Thank You!

ABOUT US

Taylor Crane & Rigging – Trailer 

ABOUT US

2019 TCR Gumbo Luncheon

9

Transformer Switch over Mezzanine

Taylor moved (2) transformers on Mezzanine above chrome plating dip tanks. The transformers had to be switched. The first one weighed 1000# and the second one weighed 1700#..

9

Ball Mill Tire Change Out

Southern Welding contracted TCR to change out two 15′-diameter, 31,000-lb. tires and the adjacent rings (also 15′ in diameter) at the Central Plains Cement plant in Tulsa, OK..

9

Feed Water Heater Changeout

Taylor Crane & Rigging was challenged with removing two 115,000-lb. vessels and reinstalling two new replacement vessels from the second story of a power generation station ..

9

Plant Equipment Installation- New Plant

Supplied Manpower & equipment for Turnkey Installation of:

  • Over 40 Niagara clearing metal stamping presses
  • 22 Orttech Hydraulic units
  • 12 Sesco stock feeding systems…
9

Rear Modular Assembly Installation

Taylor Crane was awarded the contract from Forie Automation for the rear modular assembly project at the Woodbridge assembly plant in KC, MO. This project consisted of installation of the following:..

9

Sutton Table Removal & Relocation

  1. Lower, remove, and relocate sutton tables and straightener.  Taylor provided manpower, equipment and materials necessary to modify the in-board and out-board table tops and drive bases for the straightener. 